> Update: June 2007

Allhamdoulillah, the last couple of months were very busy at Tawhid. Extensive works have been carried out this year throughout the school to ensure facilities continue to be developed and improved.

AC Units
The rooms can get pretty hot, particularly from the south facing classrooms. We have now installed AC Units in all of our classrooms before the summer term. This has been most welcomed by the students providing them comfort to work in.

Cycle Shelter
We wanted to encourage the use of cycling to school. We have now installed a bicycle shelter in the school premises. Students can now have peace of mind knowing that their bikes are safe.

Table Benches/ Shelter
4 large table benches were recently installed under a sun/ rain protected shelter for lunch. Parents could also use this area as a waiting area.

External Staircase
A Steel frame staircase was erected at the back of the school, allowing a fire escape from the 3rd storey.

Glass Front Door
We replaced the front door with a new glass door, allowing more light into the passage.

Accessibility Ramp
A concrete ramp with hand rails was built leading to the entrance. Elderly people, wheelchair users and buggy users can benefit.